home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / pc / text / spacedig / v09_5 / v9_569.txt < prev    next >
Internet Message Format  |  1991-07-08  |  17KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from corsica.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr1/ota/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr1/ota/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/gYogTGq00UkVM8y05b>;
  5.           Sun, 30 Jul 89 05:18:12 -0400 (EDT)
  6. Message-ID: <MYogT=C00UkV88wE4W@andrew.cmu.edu>
  7. Reply-To: space+@Andrew.CMU.EDU
  8. From: space-request+@Andrew.CMU.EDU
  9. To: space+@Andrew.CMU.EDU
  10. Date: Sun, 30 Jul 89 05:18:03 -0400 (EDT)
  11. Subject: SPACE Digest V9 #569
  12.  
  13. SPACE Digest                                      Volume 9 : Issue 569
  14.  
  15. Today's Topics:
  16. Science observations selected for NASA/ESA Hubble Space Telescope (Forwarded)
  17.                Re: Apollo 8, 9, and 10
  18. Re: Apollo-11 lunar experiment still useful after 20 years (Forwarded)
  19.                Re: Apollo 8, 9, and 10
  20.            Re: Kuiper Airborne Observatory
  21.            Re: Apollo 8, 9, and 10 and Apollo books
  22.               Re: Apollo Ascent Modules
  23.               Re: Apollo Ascent Modules
  24. ----------------------------------------------------------------------
  25.  
  26. Date: 19 Jul 89 17:50:22 GMT
  27. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  28. Subject: Science observations selected for NASA/ESA Hubble Space Telescope (Forwarded)
  29.  
  30. Paula Clegget-Haleim
  31. Headquarters, Washington, D.C.                     July 19, 1989
  32.  
  33. Ray Villard
  34. Space Telescope Science Institute, Baltimore, Md.
  35.  
  36.  
  37. RELEASE:  89-121
  38.  
  39. SCIENCE OBSERVATIONS SELECTED FOR NASA/ESA HUBBLE SPACE TELESCOPE
  40.  
  41.      The Space Telescope Science Institute, Baltimore, Md., has 
  42. completed selection of the first science observation proposals 
  43. from the astronomy community to be carried out using the 
  44. NASA/European Space Agency (ESA) Hubble Space TelescopeMd
  45.      The Hubble Space Telescope (HST), scheduled for launch in 
  46. March 1990, is the first major international optical telescope to 
  47. be permanently stationed in low-Earth orbit.  Capable of viewing 
  48. the universe with a tenfold greater resolution than ground based 
  49. observatories, the HST has a tremendous potential for fundamental 
  50. scientific breakthroughs in astronomy.  Observing opportunities 
  51. on the powerful space facility are open to the worldwide 
  52. astronomical community. 
  53.  
  54.      "It is exciting to see the many excellant proposals and to 
  55. think of the scientific discoveries that will soon emerge when 
  56. the Hubble Space Telescope uncovers the mysteries of fundamental 
  57. scientific questions," says Neta Bahcall, Head of the institute's 
  58. Science Programs Selection Office.
  59.  
  60.      The selected observations will make use of HST's unique 
  61. capabilities to study a wide variety of astronomical objects, 
  62. from nearby planets to the horizon of the visible universe.  The 
  63. observations should help to dramatically improve current 
  64. understanding of the size, structure and evolution of the 
  65. universe.
  66.  
  67.      Among the accepted proposals are plans to search for black 
  68. holes in neighboring galaxies, to survey the dense cores of 
  69. globular star clusters, to better see the most distant galaxies 
  70. in the universe, to probe the mysterious core of the Milky Way 
  71. galaxy and to search for neutron stars that may trigger bizarre 
  72. gamma-ray bursts.
  73.  
  74.      The 162 proposals were accepted following an intensive 
  75. scientific peer review of 556 proposals submitted by astronomers 
  76. from 30 countries.  Approximately 20 percent of the proposals 
  77. were from member nations of the European Space Agency, a joint 
  78. partner with NASA on the HST project.
  79.  
  80.      The HST is such a powerful, new resource for optical 
  81. astronomy, that observing time was heavily oversubscribed.  
  82. During the first 12-month observing cycle, 11,000 hours of 
  83. observing time were requested, with only 1200 hours available.  
  84. The average length of an accepted observation is 10 hours.  
  85.  
  86.      "Unfortunately, because of the high oversubscription rate, 
  87. many excellent proposals could not be accommodated," says 
  88. Bahcall. "We expect that the available observing time will be 
  89. somewhat larger in the second cycle, due to a higher anticipated 
  90. HST observing efficiency and a lower fraction of time committed 
  91. to guaranteed time observers (GTO)."
  92.  
  93.      When HST is launched, it will undergo a 7 month check-out 
  94. and instrument calibration period.  During that time some of the 
  95. first science observations will be made by the GTOs.  They are 
  96. the astronomers on the six teams which developed HST 
  97. instrumentation, as well those astronomers who contributed to the 
  98. design of the 12-ton observatory.  
  99.  
  100.      General observer proposals will begin 7 months after launch 
  101. and most will be completed within a 12-month period, though a few 
  102. key projects will be extended over 3 years.  Slightly more than 
  103. half of HST's observing time for the first year of operation will 
  104. be available for general observers.  The remainder of the 
  105. observing time will be used by the GTO's.
  106.  
  107.      To utilize every moment of observing time and hence maximize 
  108. efficiency, HST is "over-booked" with accepted general observer 
  109. proposals by a ratio of 3:1.   One hundred eight accepted 
  110. proposals are high priority and represent 90 percent of HST 
  111. observing time.  The remaining 54 supplemental proposals 
  112. essentially "fly standby."  They will only be executed if 
  113. appropriate scheduling opportunities arise.
  114.  
  115.      Sixty-two scientists including 10 from ESA member nations 
  116. participated in the proposal review and selection process.  The 
  117. scientists were divided into six peer-review panels which covered 
  118. sub-disciplines in astronomy such as solar system, stellar 
  119. astrophysics, stellar populations, interstellar medium, galaxies 
  120. and clusters, quasars and active galactic nuclei.
  121.  
  122.      Each proposal was judged primarily for scientific 
  123. importance.  Other selection criteria took into account such 
  124. factors as the technical feasibility of the proposal and an 
  125. observer's need for the unique capabilities of HST. 
  126.  
  127.      The ranked lists of proposals assembled by the various 
  128. panels were then reviewed by a cross-discipline Time Allocation 
  129. Committee (TAC).  Space Telescope Science Institute Director 
  130. Riccardo Giacconi made the final selection based upon a review of 
  131. the TAC's recommended list of proposals. 
  132.  
  133.      The proposals now will go through a phase II process where 
  134. the guest observers will specify the technical details of their 
  135. observations.  The proposals then will be checked for technical 
  136. feasibility, such as availability of guide stars required to aim 
  137. the telescope in space and other possible problems.  At the 
  138. conclusion of phase II this fall, a catalog of approved 
  139. observations will be made available.
  140.  
  141.      The Space Telescope Science Institute is operated for NASA 
  142. under a contract with the Goddard Space Flight Center, Greenbelt, 
  143. Md., by the Association of Universities for Research in 
  144. Astronomy, Inc.  The institute is located on the Johns Hopkins 
  145. University campus in Baltimore, Md.
  146.  
  147. ------------------------------
  148.  
  149. Date: 19 Jul 89 20:56:11 GMT
  150. From: ames.arc.nasa.gov!mike@ames.arc.nasa.gov  (Mike Smithwick)
  151. Subject: Re: Apollo 8, 9, and 10
  152.  
  153. In article <4481acbf.b097@shadow.engin.umich.edu> tyg@caen.engin.umich.edu (Tom Galloway) writes:
  154. >In article <1989Jul19.005449.3163@utzoo.uucp>, henry@utzoo.uucp (Henry Spencer) writes:
  155. <> There was some discussion about whether Apollo 10 was really needed; why
  156. <> get to within 10 miles of the lunar surface and then go home?  But a lot
  157. <> of people felt that an all-up test, including a real lunar-orbit rendezvous,
  158. <> was a good idea before landing.  What finally settled the matter was that
  159. <> Apollo 10's LM was overweight and could not have flown a complete landing
  160. <> mission.
  161. <
  162. <The last was probably a good thing. I remember as a kid thinking that if I was
  163. <on 10's flight, I would have gotten some printouts before leaving of what
  164. <information would be needed to land and revendevous later, and gone ahead and
  165. <landed. So what if I would've been court-martialed....Just imagine what the
  166. <temptation would have been like if a landing and return had been possible.
  167. <
  168. >tyg   tyg@caen.engin.umich.edu
  169.  
  170. Problem is, what would you have done once you reached the surface? Apollo
  171. 10 carried no proper EVA equipment, no scientific packages. All the crew
  172. could have done was to land, lookaround and leave (assuming they could
  173. have taken off).
  174.  
  175. They probably had some emergency portable oxygen system in the case they
  176. had to perform an EVA in order to get back to the CM due to a docking
  177. malfunction. 
  178.  
  179. As I remember, Tom Stafford was himself asked if Apollo 10 should have 
  180. been the landing, and he said no, the LM needed further testing.
  181.  
  182.  
  183.  
  184.  
  185.           *** mike (still looking for a publisher) smithwick ***
  186.  
  187. "Los Angeles : Where neon goes to die"
  188. [disclaimer : nope, I don't work for NASA, I take full blame for my ideas]
  189.  
  190. ------------------------------
  191.  
  192. Date: 19 Jul 89 21:36:15 GMT
  193. From: cwjcc!mailrus!jarvis.csri.toronto.edu!csri.toronto.edu!wayne@tut.cis.ohio-state.edu  (Wayne Hayes)
  194. Subject: Re: Apollo-11 lunar experiment still useful after 20 years (Forwarded)
  195.  
  196. In article <28736@ames.arc.nasa.gov> yee@trident.arc.nasa.gov (Peter E. Yee) writes:
  197. >     Once the laser beam hits a reflector, scientists at the 
  198. >observatories use sensitive filtering and amplification equipment 
  199. >to detect the return signal.  The reflected light is too weak to 
  200. >be seen with the human eye, but under good conditions, one photon 
  201. >-- the fundamental particle of light -- will be received every 
  202. >few seconds.
  203.  
  204. Is this right? I would think that many more than that would get back. 
  205. Besides, if you only got one back every few seconds, it would be
  206. useless for the accuracy of timing needed to calculate the moons
  207. distance with "unprecedented accuracy".
  208. -- 
  209. ------------------------------------------------------------------------------
  210. "Open the pod bay doors, HAL."   "I'm sorry Dave, I'm afraid I can't do that."
  211. Wayne Hayes    INTERNET: wayne@csri.toronto.edu    CompuServe: 72401,3525
  212.  
  213. ------------------------------
  214.  
  215. Date: 19 Jul 89 05:03:00 GMT
  216. From: mailrus!caen.engin.umich.edu!tyg@tut.cis.ohio-state.edu  (Tom Galloway)
  217. Subject: Re: Apollo 8, 9, and 10
  218.  
  219. In article <1989Jul19.005449.3163@utzoo.uucp>, henry@utzoo.uucp (Henry Spencer) writes:
  220. > There was some discussion about whether Apollo 10 was really needed; why
  221. > get to within 10 miles of the lunar surface and then go home?  But a lot
  222. > of people felt that an all-up test, including a real lunar-orbit rendezvous,
  223. > was a good idea before landing.  What finally settled the matter was that
  224. > Apollo 10's LM was overweight and could not have flown a complete landing
  225. > mission.
  226.  
  227. The last was probably a good thing. I remember as a kid thinking that if I was
  228. on 10's flight, I would have gotten some printouts before leaving of what
  229. information would be needed to land and revendevous later, and gone ahead and
  230. landed. So what if I would've been court-martialed....Just imagine what the
  231. temptation would have been like if a landing and return had been possible.
  232.  
  233. tyg   tyg@caen.engin.umich.edu
  234.  
  235. ------------------------------
  236.  
  237. Date: 19 Jul 89 12:49:31 GMT
  238. From: b.gp.cs.cmu.edu!Ralf.Brown%B.GP.CS.CMU.EDU@pt.cs.cmu.edu
  239. Subject: Re: Kuiper Airborne Observatory
  240.  
  241. In article <150@cfa.HARVARD.EDU>, willner@cfa.HARVARD.EDU (Steve Willner) wrote:
  242. }Just a tiny correction.  The KAO is entirely operated by NASA - no NSF
  243. }or other agency involvement whatever.  The next-generation airborne
  244. }observatory (SOFIA - Stratospheric Observatory For Infrared Astronomy)
  245. }will be a joint project of NASA and the West German space agency.
  246. }(BMFT, I think, though darned if I know what the initials stand for.)
  247.   ^^^^
  248. I'm pretty sure it's "Bundesministerium fuer Forschung und Technologie"
  249. (Ministry of Research and Technology).
  250.  
  251. --
  252. UUCP: {ucbvax,harvard}!cs.cmu.edu!ralf -=-=-=-=- Voice: (412) 268-3053 (school)
  253. ARPA: ralf@cs.cmu.edu  BIT: ralf%cs.cmu.edu@CMUCCVMA  FIDO: Ralf Brown 1:129/46
  254. FAX: available on request                      Disclaimer? I claimed something?
  255.  
  256. PROGRAM n. A magic spell cast over a computer allowing it to turn one's input
  257.   into error messages.  tr.v. To engage in a pastime similar to banging one's
  258.   head against a wall, but with fewer opportunies for reward.
  259.         -- from a flyer advertising for _Inside_Turbo_Pascal_
  260.  
  261. ------------------------------
  262.  
  263. Date: 19 Jul 89 17:25:02 GMT
  264. From: asuvax!enuxha!kluksdah@handies.ucar.edu  (Norman C. Kluksdahl)
  265. Subject: Re: Apollo 8, 9, and 10 and Apollo books
  266.  
  267. In article <30095@ucbvax.BERKELEY.EDU>, bwood@janus.uucp (Blake Philip Wood) writes:
  268. > For a long time Apollo 12 was to have been the first moon landing, but
  269. > the successes of the earlier flights allowed NASA to move it up to 
  270. > Apollo 11.  Cunningham states that the smart money within NASA (and 
  271. > there were bets made) was placed on Charles Conrad to do the first 
  272. > moonwalk.  As it turned out, Conrad made the third moonwalk on Apollo 12.
  273. Also read "Carrying the Fire" by Mike Collins.  According to Collins, the
  274. schedule was for Conrad to command Apollo 11.  That was screwed up when
  275. Collins, then scheduled to fly on Apollo 8, was taken off the flight list
  276. because of a medical problem in his spinal column.  His backup flew on 8,
  277. and the successive schedule was perturbed.  As a result, Conrad was bumped
  278. back from commanding 11 to commanding 12.  Also as a result, Collins was
  279. assigned to 11 after he recovered from surgery.  Good book.  In this time
  280. of nostalgia, "Carrying the Fire" is another good book to read.
  281.  
  282. **********************************************************************
  283. Norman Kluksdahl              Arizona State University
  284.             ..ncar!noao!asuvax!enuxha!kluksdah
  285. alternate:   kluksdah@enuxc1.eas.asu.edu
  286.  
  287. standard disclaimer implied
  288.  
  289. ------------------------------
  290.  
  291. Date: 19 Jul 89 23:11:25 GMT
  292. From: mailrus!jarvis.csri.toronto.edu!utgpu!utzoo!henry@g.ms.uky.edu  (Henry Spencer)
  293. Subject: Re: Apollo Ascent Modules
  294.  
  295. In article <1480@xn.LL.MIT.EDU> wjc@XN.LL.MIT.EDU (Bill Chiarchiaro) writes:
  296. >I checked the NASA Satellite Situation Report, Vol. 28, No. 4, Dec.
  297. >31, 1988 for non-booster Apollo items still in orbit...
  298.  
  299. Does it state the basis for assuming this hardware is still in orbit?
  300. I greatly doubt that it is possible to track the things in lunar orbit;
  301. that's difficult even in Clarke orbit unless there's a transponder aboard.
  302.  
  303. >Glaringly absent, however, was any listing of the Apollo 13 LM.
  304. >According to one text I have, that LM was never staged (the ascent and
  305. >descent stages were kept together) and was jettisoned 18,000 km from
  306. >earth.
  307.  
  308. Right.  It went into the Pacific as the CM reentered.  There wasn't any
  309. alternative, since the LM was needed to maneuver the CM into a proper
  310. reentry trajectory with the SM dead.
  311. -- 
  312. $10 million equals 18 PM       |     Henry Spencer at U of Toronto Zoology
  313. (Pentagon-Minutes). -Tom Neff  | uunet!attcan!utzoo!henry henry@zoo.toronto.edu
  314.  
  315. ------------------------------
  316.  
  317. Date: 19 Jul 89 16:40:05 GMT
  318. From: wjc@XN.LL.MIT.EDU  (Bill Chiarchiaro)
  319. Subject: Re: Apollo Ascent Modules
  320.  
  321.  
  322.  
  323. I checked the NASA Satellite Situation Report, Vol. 28, No. 4, Dec.
  324. 31, 1988 for non-booster Apollo items still in orbit.  Here's what I
  325. found:
  326.  
  327.  
  328. Int'l Desig.    Catalog #    Name        Orbit        Mission
  329.  
  330. 1969 043C    3948        LM/DESCENT    Selenocentric    Apollo 10
  331. 1969 043D    3949        LM/ASCENT    Heliocentric    Apollo 10
  332.  
  333. 1969 059C    4041        LUNAR MODULE    Selenocentric    Apollo 11
  334.  
  335. 1971 063D    5377        SUBSATELLITE    Selenocentric    Apollo 15
  336.  
  337. 1972 031C    6005        LUNAR MODULE    Selenocentric    Apollo 16
  338.  
  339.  
  340. The LMs from Apollos 5 (unmanned, earth-orbit test of LM-1), 9, 12,
  341. 14, 15, and 17 were all listed as decayed (actually, only the ascent
  342. stages were mentioned for 12, 14, 15, and 17).
  343.  
  344. Glaringly absent, however, was any listing of the Apollo 13 LM.
  345. According to one text I have, that LM was never staged (the ascent and
  346. descent stages were kept together) and was jettisoned 18,000 km from
  347. earth.
  348.  
  349.  
  350. Notes on Apollo 9 and Apollo 10:
  351.  
  352. As has recently been stated, Apollo 10 was the mission that was
  353. essentially a lunar dry-run of the Apollo 11 landing.  We must be
  354. careful, though, in saying that its LM "descended" to within some
  355. distance of the lunar surface.  Early in the mission planning, an
  356. abort from powered descent was considered, but was passed up in favor
  357. of a mission that emulated a landing in every regard except for
  358. powered descent and subsequent takeoff from the lunar surface.  With
  359. Young in the CSM (Charlie Brown), Cernan and Stafford in the LM
  360. (Snoopy) performed a DOI (descent orbit insertion).  This orbit had a
  361. perilune of about 15 km above the mean lunar surface -- this was their
  362. closest approach to the surface.  It was from such an orbit that later
  363. LMs began their powered descents.  The ascent and descent staging
  364. occured, but I don't remember at which point.  Also, I believe the
  365. descent engine as well as the ascent engine was used for orbital
  366. manuevers.  Cernan and Stafford spent 8 hours in the LM.  Later, upon
  367. ground command, the ascent stage expended all its fuel and was put
  368. into a heliocentric orbit.
  369.  
  370. One of the other forgotten Apollo mission was 9 -- the earth-orbit
  371. test of the LM.  Scott stayed with the CSM (Gumdrop) and McDivitt and
  372. Schweickart spent 6 hr 20 min in the LM (Spider).  They achieved a
  373. maximum separation of 185 km and did perform ascent/descent staging.
  374.  
  375.  
  376. Bill Chiarchiaro
  377. N1CPK
  378. wjc@xn.ll.mit.edu
  379.  
  380. ------------------------------
  381.  
  382. End of SPACE Digest V9 #569
  383. *******************
  384.